How Would Philippines Social Housing and Big Industry Gain From Net Metering Cap Lift
A bill that is currently passing through the Philippines Senate would allow commercial and industrial (C&I) entities to optimise the use of their rooftops with solar power, while also helping reduce costs for housing initiatives for the underprivileged, according to the head of a Filipino trade association.
The current Renewable Energy Act of 2008 limits the net metering program to 100kW. This means end users that install 100kW or above are not entitled to any electricity credits. At present, the programme does support smaller businesses and residences who are exporting their solar power back to the grid.
However, Theresa Capellan, president of the Philippine Solar and Storage Energy Alliance (PSSEA), told PV Tech: “Businesses and industrial entities who have large roof and electricity usage cannot optimize their rooftop for own use because the programme doesn’t allow them to participate.
“Removing the cap imposed by the renewable energy law on rooftop solar is the way to go.”
Capellan described the Senate Bill No. 1719 as timely, given the huge drop in solar module costs, which she claimed can now help consumers reduce their electricity bills by at least 40%.
Moreover, she added that the removal of the installation cap would give socialized housing, which are housing initiatives for the underprivileged and homeless in the Phillippines, the opportunity to lower their costs.
Capellan, who is also president of local firm SunAsia Energy Philippines, explained how SINAG homes, a socialized housing initiative sponsored by SUnAsia Energy and the housing cooperative ALPAS, located in San Jose del Monte, has 570 homes in 26 buildings sharing one solar energy resource. They are already reducing power bills through smart technology, but a net metering cap removal would allow the socialized housing to benefit further with the planned deployment of a 150kW system.
Capellan added: “So, the notion that solar is only for the rich households doesn’t hold water. SINAG Homes is proof it will benefit low-income households. “
The Senate Bill is currently being pushed by Senator Grace Poe who wants to end institutional barriers to rooftop solar and help its proliferation across the country, as reported by the Philippines News Agency. Poe backs rooftop solar because of reduced electricity costs – The Philippines has the highest power costs in Southeast Asia – and because it does not require land conversion.
Other key parts of the bill being pushed include a provision that the same reference price should be applied to both electricity imported from and exported to the grid by end-users; a mandate for regulators to standardise permits and licenses for rooftop PV installations; and institutionalization of the rooftop solar loan programme.
Despite optimism from the PV sector, the Electricity Regulatory Commission (ERC) on 19 November was quoted by the Department of Energy (DOE) as saying that the removal of the 100kW cap could have an adverse effect on transmission lines, which may not be able to accommodate injections of power beyond that limit. Furthermore, a passage of the bill into law would trigger a new study on the grid’s ability to absorb new output.
PV Tech recently visited a solar-storage-diesel micro-grid in Paluan, Mindoro, an installation by developer Solar Philippines, which is in the midst of pushing through a different, more controversial House Bill (HB 8179), that would give the company a mini-grid and transmission franchise across the country.
--
For more inquiries, comments and updates:
Visit our website at www.crownasiaphilippines.com
FB Page: Crown Asia Philippines
Contact/Viber us: 0917 512 5475
Crown Asia Philippines
Crown Asia not only offers the “trophy” home every family deserves, but also the primmest location where every community has access to different needs within arm’s reach. Up to this date, this Vista Land Company subsidiary has proven that Filipino families deserve a quality home where they can raise good values among their homes and community. Founded in 1995, Crown Asia still thrives to build beautiful homes that are meant to last for generations where families share cherished memories and enjoy limitless celebrations. It has earned its title to be one of the top home-developers in the Philippines catering to middle and upper-income earning families. It is also praised for their themed-communities inspired from stunning places around the world.
you may also like
Contact Us
For inquires, sample computation or to schedule an exclusive property viewing, please contact:
CROWN ASIA SALES TEAM
Mobile / Viber Number:
(+63) 917 512 5475
(+63) 977 182 4135
(+63) 997 965 5046
(+63) 939 589 6263
(+63) 926 473 4019
Head Office
Lower G/F, Building B,
Evia Lifestyle Center, Vista City,
Daang Hari, Las PiƱas City
Email Us
crownasiaphilippines@gmail.com
Easy Steps to Buy
1 |
Schedule Property ViewingSchedule an exclusive property viewing with our property consultant to your desired project. To schedule an appointment, you may contact (+63) 917 512 5475. For overseas-based clients, you may request for your family or representative to have the viewing on your behalf. |
2 |
Unit ReservationDuring property viewing, you'll be presented with the best available units within latest inventory. You may reserve your desired unit by filling out the Buyer Information Sheet, Reservation Forms and paying the reservation fee. Requirements to bring: Two (2) valid ID and TIN number (both spouses if married). |
3 |
Submit Required DocumentsPersonal and documentary requirements must be submitted within 30 days from the date of reservation. A checklist of requirements can be downloaded here. Bank financing is developer-assisted (see list of accredited banks). |
4 |
Pay DownpaymentPayment of required downpayment is made through post-dated cheques (PDCs) payable to Crown Asia. Downpayment can be paid on lump sum or monthly installment at zero interest. |
5 |
Unit TurnoverAfter downpayment, wait for the unit construction to finish and for home loan application to be approved (if bank financing) before we can schedule a unit inspection. After inspection, client may now accept the unit and move-in. |
List of Requirements
- 2 pcs. Philippine-issued Valid ID
- Accomplished Customer Information Sheet
- Accomplished Reservation Agreement Form
- Reservation Fee
If married, both spouses shall submit the following:
- 3 pcs. 1x1 picture
- 2 Philippine-issued Valid ID
- Birth Certificate (if single)
- Marriage Certificate (if married)
- Proof of Billing Address or Barangay Certificate
- Tax Identification Number
- Post Dated Cheques
- Certificate of Employment with Compensation
- Payslips (latest 3 months)
- Latest Income Tax Return (ITR)
- Bank Statements (latest 6 months)
- Vouchers latest 6 months (for commission-based employee)
- Photocopy of Passport
- Job Contract (photocopy)
- Passport stamp entries
OFW/Immigrants buyers must assign a family/relative as their Attorney-in-fact (AIF) in their home purchase. AIF must likewise submit the following requirements:
- 3 pcs. 1x1 picture
- 2 pcs. Philippine-issued valid ID
- Proof of Billing Address
- Special Power of Attorney Form (Notarized/Consularized)
Additional requirements for business owners (self-employed) with minimum 3 years of operation:
- Business Permit
- Latest 3 years ITR with Financial Statement
- Photo of Business Establishment
- Bank Statements latest 1 year